Our first step have been
taken in 1980 by Vahap Önal, as Sn. Pak's technical
staff in construction. Our activities continued with
ITU Basic Sciences Campus Maslak, Ataköy Emlak Bank
Housing A3, A4, and B of Block 180 Apartments coarse
and fine structure, Merter Keresteciler 2 business centers
on site and later in 1985 at Erenköy Sahrayicedit Dilkum
Construction 27000 square metres of land belonging to
the 8 blocks as in The housing construction of 380 apartments
in the structure of the rough, still based in Tuzla
Dilkum Construction of 21 villas with all the rough
construction and landscaping work and construction Dilkum's
1000 car parking Cağaloğlu floor structure of the rough.
The company was founded in 1994 as BURC Construction
Limited. Burç Construction, the Group of Boğaziçi textile
factory in Turkmenistan and the presidential villa and
landscape work, Atasehir Alarko-BAYTUR-Eltes companies
belonging to the business center, and about 2 pieces
200.000m2 around the field of environmental regulation
and did landscape work.
From 2001 until 2006 as a branch of Yapi Kredi Bank,
the Marmara region decoration contractors, have completed
a rough structure and to strengthen business.
Currently, domestic and international work is ongoing. |